Unloading, installation and wiring of 14 motor core production units
Unloading and unpacking, positioning and leveling, and electrical and communication connections between units.
Apaseo el Grande, Guanajuato
See the equipment, work performed and locations. Search by type of work, year or keyword.
Showing 1–12 of 83
Unloading and unpacking, positioning and leveling, and electrical and communication connections between units.
Layout marking and positioning, leveling with a precision spirit level where required, and wiring between equipment and control panels.
Wheel removal and refitting, O-ring replacement, reassembly and operation checks.
Material procurement, machining coordination and delivery for a component over 1 m in diameter.
Removal of the vertical unit and installation using a crane.
Fabrication, transport and installation of the acoustic enclosure, with associated electrical work.
Removal of cracked material by gouging and drilling, followed by grinding to finish the profile.
Reconnection of power and piping after relocation, with work on an approximately 9 m pit and metal covers.
Equipment relocation, including installation of feeder wiring and main utility piping from the plant to the equipment.
Relocation of one molding machine, including electrical work, equipment piping and compressed-air piping.
Electrical and piping reconnection during equipment replacement, with connections and branches for large-diameter exhaust ducts.
Relocation of an existing transformer and power connection to the equipment.
No matching work found. Try different filters or keywords.
Each entry describes a scope of work. A project involving several types of work may appear in more than one entry. For fabricated items, the location refers to the destination equipment or delivery point. Some component names and locations are generalized to protect customer information.
You do not need to have everything worked out. Send us a message or share a photo.